Better Late Than Never: Annamalai's Letter Requesting Central Funds For Chennai Metro Phase 2 Is A Welcome Intervention
Chennai Metro's Strategic Downsizing: Phase 2 Sees Reduced Station Sizes Amid Lack Of Funding From Centre
Chennai Metro: CMRL To Introduce First Driverless Train By August
Construction Milestone: Work On Tallest Pillar For Chennai Metro's Phase II Started At Kathipara
Chennai Metro Phase 2 To Feature Futuristic Driverless Trains On 63 State-Of-The-Art Steel Bridges
Chennai Metro: CMRL To Begin Track Laying Work On Poonamallee-Porur Stretch In July
Chennai Metro Phase II: CMRL Plans To Start 11-Km Madhavaram To Retteri Stretch By End Of 2026
Chennai Metro Phase 2: Study For New Parandur Airport Link, 93 Kilometres New Lines To Be Ready Soon
Chennai Metro Phase II: Linxon India Bags Rs 404.45 Crore Electrical Work Contract For Corridor 3 And Corridor 5
Chennai Metro: RVNL Emerges As Lowest Bidder For Sholinganallur Lake-SIPCOT Section Of Metro Line-3